Efficient And Best Accurate




Detailed description

Incineration test

Detection standard

  • Detection specification

Where to do the incineration test? Where to get the incineration test report with high recognition? BAIJIAN material testing agency can provide incineration testing services for CMA qualification certification agencies, high-tech enterprises, and third-party material laboratories, focusing on product development and quality For problems encountered in control, we provide comprehensive solutions such as component analysis, product testing, product testing, instrument testing, etc., with complete instruments and a strong scientific research team. Test reports can be issued in 7-15 working days. We support scanning QR codes to check authenticity, nationwide. Door-to-door sampling and sample testing services provide short testing cycles, low testing costs, and scientific and accurate testing data! Testing period: For specific periods, please contact an engineer to answer your questions.

Test cycle: For specific cycles, please contact the laboratory engineer to answer your questions.

Testing fee: Engineers will develop an experimental plan and quote based on the customer's testing needs and the complexity of the experiment.

Incineration test scope

Battery incineration test, hazardous waste incineration test, garbage incineration test, mask incineration test, derived fuel incineration test, cat litter incineration test, asphalt mixture incineration test, pollution Mud burning test, battery burning test, plastic burning test, etc.

Incineration test items

Laboratory incineration test, incineration test, incineration smoke test, incineration fly ash test, incineration slag test, composition analysis, unknown substance analysis and identification, VOC test, Toxicology testing, elemental analysis, incineration chloride testing, incineration non-standard testing, etc. (If you have other needs, you can directly contact the online laboratory engineer to provide you with one-on-one service.)

What are the functions of the BAIJIAN test report? What problems can it help you solve?

1. Sales use. (Sell your own products and issue third-party testing reports to make customers more confident in the quality of your products)

2. R&D and use. (During the research and development process, some difficult problems are encountered, and the problems are solved through test report data, thereby shortening the research and development cycle and reducing research and development costs)

3. Improve product quality. (By comparing test data, we can discover the problems of our own products, improve product quality, and reduce production costs)

4. Use of scientific research paper data.

5. Use for performance testing.

Incineration test standards

GB/T 25032-2010 Domestic waste incineration slag aggregate

GB/T 30505-2014 Measurement method of flue gas emissions from marine incinerators

CJ/T 531-2018 Sampling and testing of ash from domestic waste incineration

CJ 3036-1995 Environmental hygiene of medical waste incineration Standards

HJ 2037-2013 Technical specifications for waste incineration disposal engineering containing polychlorinated biphenyls

JB/T 11310-2012 Filter materials for bag dust collectors for waste incineration tail gas treatment

DIN 51397-1-1997 Lubricants inspection. Determination of iron content in lubricants. Part 1: Determination by atomic absorption spectrometry after incineration

What are the advantages of BAIJIAN testing? Why choose BAIJIAN?< /h2>

1. BAIJIAN is a collective ownership testing institution.

2. Initial inspection samples.

3. Multiple laboratory branches across the country support door-to-door sampling/send sample testing.

4. The testing cycle is short, the testing cost is low, and the experimental plan is complete.

5. Complete qualifications, complete laboratory equipment, and a strong scientific research team.

6. Support MSDS writing service in 36 languages

BAIJIAN sample sending and testing process

1. Sample sending

2. Initial inspection Sample

3. Quotation

4. Both parties confirm, sign a confidentiality agreement, and start the experiment

5. Complete the experiment in 7-15 working days

6. Issue test reports and provide follow-up services.

The above is the relevant introduction to the incineration test. If you have other testing needs, you can consult the laboratory engineer to help you answer it.

Previous post:Light transmittance detection Next chapter:


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo