Detailed description

Partial discharge test

Detection standard

  • Detection specification

Where to go for partial discharge testing with complete solutions? BAIJIAN Materials Testing Agency provides partial discharge testing services. It is a national high-tech enterprise, a third-party materials laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments and scientific research. The team is strong, adhering to the concept of scientific research and dedication, and is engaged in performance testing, non-standard testing, unknown substance testing and identification, industrial problem diagnostic testing, composition testing, failure testing, corrosion testing, etc. Test reports will be issued in 7-15 working days, supporting 2D The code system checks the authenticity, and multiple laboratory branches across the country support door-to-door sampling/sample delivery testing services nationwide.

Test period: 7-15 working days

Test fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment.

Partial discharge test scope

Transformers, 10KV cables, bushings, cable joints, high-voltage transformers, switch cabinets, reactors, high-voltage capacitors, power cables, switch cabinets, UHV Transformers, electrical equipment, insulated switchgear, cross-linked polyethylene cables, etc.

Partial discharge test items

Transformer partial discharge test, cable partial discharge test, inflatable cabinet partial discharge test, arrester partial discharge test, motor partial discharge test, photovoltaic backplane partial discharge test , Circuit breaker partial discharge test, power frequency withstand voltage and partial discharge test, switch cabinet partial discharge test, etc.

What does the BAIJIAN test report do? What problems can it help you solve?

1. Sales report. (Sales need to provide third-party testing reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)

2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party testing data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)

3. Improve products quality. (Discover problems with your own products through comparison of third-party testing data, improve product problems, improve quality, and reduce production costs)

4. Use of scientific research paper data.

Partial discharge test

GB/T 3048.12-2007 Electrical performance test methods for wires and cables Part 12: Partial discharge test

GB/T 7354-2018 High voltage test technology partial discharge measurement

GB/T 17648-1998 Insulating liquid partial discharge onset voltageDetermination test procedures

GB/T 20833.1-2016 Rotating electrical machines Stator winding insulation of rotating electrical machines Part 1: Offline partial discharge measurement

GB/T 20833.2-2016 Rotating electrical machines Stator windings of rotating electrical machines Insulation Part 2: Online partial discharge measurement

GB/T 22720.1-2017 Identification and quality control test of electrical insulation structure of rotating electrical machines powered by voltage-type inverters without partial discharge (Type I)

p>

DL/T 1243-2013 On-site partial discharge testing technology for converter transformers

DL/T 1534-2016 UHF detection method for partial discharge of oil-immersed power transformers

DL/T 1999-2019 Converter Transformer DC Partial Discharge Measurement Field Test Method

DL/T 2000-20191000kV AC Transformer Body and Voltage Regulation Compensation Transformer Combined Partial Discharge Field Test Method

DL/T 2050-2019 High-voltage switchgear transient ground voltage partial discharge on-site detection method

JB/T 10435-2004 Cable partial discharge test system calibration method

JB/ T 12422-2015 Partial discharge test method for electrical insulating materials and insulating parts

What are the advantages of BAIJIAN material testing laboratory?

1. Collectively owned testing institution, complete qualifications, test report Scientific, fair and accurate.

2. Multiple laboratory branches are located across the country, supporting door-to-door sampling/sending samples for testing.

3. The testing cycle is short, the testing cost is low, and the experimental plan is more complete.

4. For initial inspection of samples, no testing fees will be charged during the initial inspection.

5. The test report supports scanning the QR code to check the authenticity.

BAIJIAN testing process

1. Send samples. (Communicate with engineers, submit your own testing requirements and send samples to our research institute)

2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)

3. Quotation. (After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment)

4. Both parties confirm, sign a confidentiality agreement, and start the experiment.

5. It takes 7-15 working days to complete the experiment.

6. Mail the test report and provide post-service.

The above is the relevant introduction to partial discharge testing. If you have other testing needs, you can consult the laboratory engineer to help you solve it.

Previous post:Tracking Index Test Next chapter: