Efficient And Best Accurate




Detailed description

Insulation resistance test

Detection standard

  • Detection specification

Where can I go to get a complete solution for insulation resistance testing? BAIJIAN Materials Testing Agency provides insulation resistance testing services. It is a national high-tech enterprise, a third-party materials laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments and scientific research. The team is strong, adhering to the concept of scientific research and dedication, and is engaged in performance testing, non-standard testing, unknown substance analysis and identification, industrial problem diagnostic analysis, composition testing, failure analysis, corrosion analysis, etc. Test reports will be issued in 7-15 working days, supporting 2D The code system checks the authenticity, and multiple laboratory branches across the country support door-to-door sampling/sample delivery testing services nationwide.

Test period: 7-15 working days

Test fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's test needs and the complexity of the experiment.

Test scope: Transformers, metal oxide arrester bases, non-metallic materials, high-voltage cables, communication cables, hand-held power tools , electric motors, high-voltage oil-less switches, copper-clad foil boards, film-coated flat wires, insulators, wire clamps, generator stators, insulation blankets, electrical equipment, low-voltage electrical appliances, etc.

Test item: Insulation resistance test

What is the role of the BAIJIAN test report? What can it help you solve? Questions?

1. Sales report. (Sales need to provide third-party test reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)

2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party test data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)

3. Improve products quality. (Discover the problems of your own products through comparison of third-party test data, improve product problems, improve quality, and reduce production costs)

4. Use of scientific research paper data.

Insulation resistance test standard

GB/T 1692-2008 Determination of insulation resistivity of vulcanized rubber

GB/T 2522-2017 Test method for insulation resistance and adhesion of electrical steel strip (sheet) coating

GB/T 3048.5-2007 Test method for electrical properties of wires and cables Part 5: InsulationInsulation resistance test

GB/T 15479-1995 Technical requirements and test methods for insulation resistance and insulation strength of industrial automation instruments

GB/T 17737.102-2018 Coaxial communication cable No. 1-102 Part: Electrical test methods Cable dielectric insulation resistance test

GB/T 20160-2006 Insulation resistance test of rotating electrical machines

GB/T 24343-2009 Insulation resistance test specifications for industrial machinery and electrical equipment< /p>

GB/T 26675-2011 Insulation resistance test specifications for machine tool electrical, electronic and programmable electronic control systems

GB/T 35856-2018 Insulation resistance and withstand voltage test methods for aircraft electrical equipment< /p>

DL/T 474.1-2018 Field Insulation Test Implementation Guide Insulation Resistance, Absorption Ratio and Polarization Index Test

QJ 1238.16-1987 Cable Test Method on Missile Launch Vehicle Insulation Resistance Test< /p>

QJ 2220.2-1992 Test method for electrical insulation properties of coatings Insulation resistance, surface resistivity: Test method for volume resistivity

SJ/T 11385-2008 General specifications for insulation resistance testers< /p>

TB 1447-1982 Insulation resistance of signaling products

TB/T 1447-2015 Insulation resistance of railway signaling products

TB/T 2249-1996 Railway passenger car electrical Wiring insulation resistance test method

TB/T 3396.5-2015 High-speed railway fastener system test method Part 5: Determination of insulation resistance

WJ/T 9087-2015 Detonator pin Measurement of line capacitance, insulation resistance and insulation breakdown performance

What are the advantages of BAIJIAN materials testing laboratory?

1. Collectively owned testing institution, complete qualifications, scientific and fair test reports, precise.

2. There are many laboratory branches all over the country, supporting door-to-door sampling/sample delivery testing.

3. The test cycle is short, the test cost is low, and the experimental plan is more complete.

4. For initial inspection of samples, no testing fees will be charged during the initial inspection.

5. The test report supports scanning the QR code to check the authenticity.

BAIJIAN test process

1. Send samples. (Communicate with engineers, submit your own test requirements and send samples to our research institute)

2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)

3. Quotation. (After the initial inspection, a quotation will be made based on the customer's test needs and the complexity of the experiment)

4. Both parties confirm, sign a confidentiality agreement, and start the experiment.

5. It takes 7-15 working days to complete the experiment.

6. Mail the test report and provide post-service.

The above is the relevant introduction to the insulation resistance test. If you have other test needs, you can consult the laboratory engineer to help you solve it.

Previous post:Leakage current detection Next chapter:


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo