Efficient And Best Accurate




Detailed description

Wind load test

Detection standard

  • Detection specification

Where can I go to get a complete solution for wind load testing? BAIJIAN Materials Testing Agency provides wind load testing services. It is a national high-tech enterprise, a third-party materials laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments. , a strong scientific research team, adhering to the concept of scientific research and dedication, engaged in performance testing, non-standard testing, unknown substance detection and identification, industrial problem diagnosis and testing, composition testing, failure testing, corrosion testing, etc. Test reports will be issued in 7-15 working days to support The QR code system checks authenticity, and multiple laboratory branches across the country support nationwide door-to-door sampling/sample delivery testing services.

Test period: 7-15 working days

Testing fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment.

Wind load test range

Exterior walls, wooden boards, anti-glare boards, single cantilevers, advertising racks, telephone poles, exterior wall insulation, steel structures, awnings, wall panels, Doors and windows, buildings, brick walls, fences, steel columns, steel bars, brackets, etc.

Test project: Wind resistance load test

BAIJIAN Materials Laboratory Wind Resistance Experiment Project

Wind resistance test

What does the BAIJIAN test report do? What problems can it help you solve?

1. Sales report. (Sales need to provide third-party testing reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)

2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party testing data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)

3. Improve products quality. (Discover problems with your own products through comparison of third-party testing data, improve product problems, improve quality, and reduce production costs)

4. Use of scientific research paper data.

Wind load test standard

EN 12444:2000 Industrial, commercial and garage doors, wind resistance of gates Load capacity. Tests and calculations

DIN EN 12179:2000 Curtain walls. Wind load resistance. Test methods

DIN EN 12211:2000 Doors and windows. Wind load resistance. Test methods

BS EN 12444:2001 Industrial, commercial and garage doors. Wind load resistance. Testing and calculation

GB/T 32059-2015 Fatigue test method for wind pressure load resistance of high-speed EMU windows and doors

GM GM9674P-2011 Verification procedure for minimizing tensile loads against high temperature risk. 2nd publication. Not applicable to new schemes. No replacement

AS 1170.2-1989 Minimum design of structures (i.e. SAA load rules) Load. Wind load

What are the advantages of BAIJIAN material testing laboratory?

1. Collectively owned testing institution with complete qualifications and scientific, fair and accurate test reports.

2. Multiple laboratory branches are located across the country, supporting door-to-door sampling/sending samples for testing.

3. The testing cycle is short, the testing cost is low, and the experimental plan is more complete.

4. For initial inspection of samples, no testing fees will be charged during the initial inspection.

5. The test report supports scanning the QR code to check the authenticity.

BAIJIAN testing process

1. Send samples. (Communicate with engineers, submit your own testing requirements and send samples to our research institute)

2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)

3. Quotation. (After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment)

4. Both parties confirm, sign a confidentiality agreement, and start the experiment.

5. It takes 7-15 working days to complete the experiment.

6. Mail the test report and provide post-service.

The above is the relevant introduction to wind load testing. If you have other needs, you can consult the laboratory engineer to help you solve it.

Previous post:Lateral pull test Next chapter:


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo