Efficient And Best Accurate




Detailed content

List of testing items and standards for water supply and drainage monitoring systems

How to handle the water supply and drainage monitoring system test report? What are the water supply and drainage monitoring system test items and standards? BAIJIAN third-party testing agency provides water supply and drainage monitoring system test report processing, engineers provide one-to-one service, and select the corresponding test standards and standards according to needs For the project, after formulating the testing plan, arrange for the laboratory to send samples for testing. Water supply and drainage monitoring system testing services

Test report: Water supply and drainage monitoring system testing

Report qualifications: CNAS, CMA, CAL

Report format: both Chinese and English

Reporting cycle: Normally 3-15 working days, except for special sample projects.

Test items for water supply and drainage monitoring system:

Test items:

Water pump operation monitoring, liquid level and liquid level control, variable frequency constant pressure water supply system, monitoring and management Functions, standby water pump switching, water pump switching, drainage monitoring system, overpressure, equipment failure alarm, high and low liquid level, water pump overload alarm, high water tank water supply system, overpressure equipment failure alarm, constant pressure control function, high and low liquid level water pump overload alarm , High-level water tank water supply system parameters

Water supply and drainage monitoring system testing standards:

Testing standards:

1. GB 50339-2013 Intelligent Building Engineering Quality Acceptance Specifications< /p>

Hundred Inspection Test Report Processing Process:

1. Communicate with customer service through the website contact information

2. After confirming the needs, recommend and formulate a plan, and then proceed Quotation

3. After confirming the plan and quotation, arrange for the samples to be mailed to the designated laboratory for testing

4. After the samples are sent to the laboratory, wait for the laboratory test results

5. After the laboratory test is completed, a corresponding report will be issued. If a paper report is required, it will be mailed

If it is urgent during the processing period, timely communication and urgent service must be arranged

Function of the test report:

1. Project bidding: issue third-party CMA/CNAS qualification report;

2. Online e-commerce platform settlement: quality inspection report for major e-commerce platforms Recognized by commercial platforms;

3. Used as sales reports: issue authentic and effective test reports to make consumers more assured;

4. Papers and scientific research: provide professional personalized testing Demand;

5. Judicial services: provide scientific, fair and accurate testing data;

6. Industrial problem diagnosis: verify the troubleshooting and correction of problems in industrial production links;

This concludes the introduction of testing items and testing standards related information. BAIJIAN third-party testing agency looks forward to cooperating with you. For details, please contact BAIJIAN customer service.


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo