Efficient And Best Accurate




Detailed content

Introduction to steel ball valve, ball globe valve and check valve inspection report items and stand

How to handle the test report of steel ball valve, ball globe valve and check valve? The test report results of steel ball valve, ball globe valve and check valve test samples will be compared with the requirements in the standard, and the product quality parameters will be reflected in the report. BAIJIAN third-party testing agency can provide one-stop service for testing steel ball valves, spherical globe valves and check valves. Engineers provide one-to-one service to confirm needs, recommend solutions, send samples for inspection, issue reports, and after-sales service, 3-15 Reports are issued on working days. Welcome to consult. The inspection cycle for steel ball valves, spherical globe valves and check valves is 3-15 working days. It can be expedited (except for special projects). Welcome to consult.

Test Report: Steel Ball Valve, Ball Globe Valve and Check Valve Test

Baicha has many years of experience in textiles, insulating tools, cosmetics, food and other fields, and has many cooperative laboratories across the country . Baikan always focuses on scientific research and is customer-centered. It carries out testing and analysis work under strict procedures and provides customers with one-stop services such as testing, analysis, and restoration.

Test items for steel ball valves, ball globe valves and check valves:

Test items:

Functional characteristics, dimensions, operation, marking, storage and transportation Preparation, marking, auxiliary connections

Testing standards for steel ball valves, ball globe valves and check valves:

Testing standards:

1. EN 13709:2010 Industrial valves - steel ball valves, ball globe valves and check valves 4.2

2, EN 13709:2010 Industrial valves - steel ball valves, ball globe valves and check valves EN 13709:2010

3. EN 13709:20104.2 Functional characteristics

4. EN 13709:20108 Marking, storage and transportation preparation

5. EN 13709:20107 Marking

6. EN 13709:20104.1.4 Operation

7. EN 13709:20104.1.3 Dimensions

8. EN13709:20104.1.3 Industrial valves - steel ball valves, ball globe valves and check valves

9. EN 13709:20104.1.5 Auxiliary connections

10. EN13709:20104.1.4 Industrial valves - steel ball valves, ball globe valves and check valves< /p>

11. EN13709:20104.1.5 Industrial valves - steel ball valves, ball globe valves and check valves

12. EN13709:20107 Industrial valves - steel ball valves, ball globe valves and Check valves

13. EN13709:20108 Industrial valves - steel ball valves, ball globe valves and check valves

14. EN13709:20104.2 Industrial valves - steel ballsValves, ball globe valves and check valves

Test report processing process:

1. Contact Baiqian customer service and propose testing requirements.

2. Connect with engineers to confirm the plan quotation.

3. Sign the contract and send samples for testing.

4. The laboratory completes the test and issues a test report.

5. After-sales service.

6. If urgent, please communicate in advance.

Purpose of test report

1. Used for internal product research and development of the company.

2. Improve product quality.

3. Diagnosis of industrial problems.

4. Sales use (supermarkets, e-commerce, bidding, etc.).

5. Use of data from university scientific research papers.

This concludes the introduction to product testing items, standards, and reporting procedures. Do testing, hundreds of tests, BAIJIAN looks forward to cooperating with you.


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo